Butler Freeport Historic GeoTrail
Twenty historical caches have been placed on the trail. Each cache box contains a passport (please take only one passport)or (download one here BFTHGTpassport ), visit each cache and obtain the...
View ArticlePOLICY CONCERNING USAGE OF “OTHER POWER-DRIVEN MOBILITY DEVICES
PURSUANT TO 28 C.F.R. §§ 35.130 (b)(7), (h) “A public entity shall make reasonable modifications in policies, practices, or procedures when the modifications are necessary to avoid discrimination on...
View ArticleRon Bennett, First President of the BFCTC, presented this speech at the First...
I was honored when asked to spend a few moments to talk about our trail. When my friend and tireless trail volunteer – Art Borland, asked me to talk about the trail, I asked him how long I needed to...
View Article10th Annual Buffalo Creek Half Marathon
WHEN: Saturday October 17, 2015 Race starts promptly at 9am Start- Winfield Township Building, Brose Road, Cabot, PA 16023 Finish- 2nd Street, Ext, Freeport, PA 16229 All entrants MUST park at...
View Article11th Annual Buffalo Creek Half Marathon
More details: http://www.butlerfreeporttrail.org/buffalo-creek-half/ All New Start – Cabot Methodist Church 707 Winfield Rd, Cabot, PA 16023 Finish- 2nd Street, Ext, Freeport, PA 16229
View ArticleIMPORTANT TRAIL CONSTRUCTION PLEASE READ
Happy Spring everyone, I hope you have been out enjoying the trail and all the Spring wildflowers. As many of you know Buffalo Township received two TAP grants from Penn Dot for resurfacing (with...
View ArticleImportant update 5/27/17 on trail resurfacing
Stealing Dee’s post again. Between her and I we will keep you updated. It was also indicated at the Supervisor meeting that John Haven would be contacting the contractor and have him call me with how...
View Article5-28-17RESURFACING UPDATE
RECEIVED FROM BUFFALO TOWNSHIP 5/27/17 *IMPORTANT NOTICE* “Tentative” Butler-Freeport Trail Repaving Schedule (per Brad Jeannerat with JC Lee Construction as of 5/25/17) JC Lee Construction will be...
View ArticleTrail closure update 5/31 @ 8:30 pm
UPDATE- as of this evening (5/31 @ 8:30 pm) JC Lee has surfaced about 1/4 mile. Trail closed from Dittmer Rd to Great Belt tomorrow. Should be open for Friday and the weekend. Keep you all posted....
View ArticleUpdate on construction end of day June 2nd
Trail is open but please be mindful when riding on the new surface. Monday, June 5th trail will be closed from Sheetz to Great Belt, parking areas will both be closed as well. Enjoy.
View ArticleUpdate 6-5 Resurfacing project
*IMPORTANT NOTICE* “Tentative” Butler-Freeport Trail Repaving Schedule (per Brad Jeannerat with JC Lee Construction as of 6/2/17) JC Lee Construction will be closing the Butler-Freeport Trail from...
View ArticleUpdate 6-11-17
TRAIL CLOSURE. Sheetz Drive to Marwood Road will be closed Monday-Thursday during the day this week. Please respect the closure, the contractor can work much more effectively without worring about...
View ArticleConstruction update 6-15-17
Trail is open. JC Lee is done resurfacing from Herman to Marwood, they still have to re-installing the gate and go through final inspection next Friday. Please do not use Sheetz Dr Trailhead as the...
View ArticleUpdate June 23 Trail Resurfacing
*IMPORTANT NOTICE* “Tentative” Butler-Freeport Trail “RESURFACING” Schedule (per Brad Jeannerat with JC Lee Construction/Ken Howard with Bankson Engineers as of 6/23/17) *The Butler-Freeport Trail will...
View ArticleUpdate on Trail resurfacing
“Tentative” Butler-Freeport Trail “RESURFACING” Schedule (Per Brad Jeannerat with JC Lee Construction/John Haven, Chairman of the Buffalo Township Board of Supervisors as of 6/29/17) JC Lee...
View ArticleIMPORTANT PLEASE READ
*IMPORTANT NOTICE* “Tentative” Butler-Freeport Trail “RESURFACING” Schedule (per Brad Jeannerat with JC Lee Construction/John Haven, Chairman of the Buffalo Township Board of Supervisors as of 7/7/17)...
View ArticleUpdate trail resurfacing 7-21-17
*1st IMPORTANT NOTICE* “Tentative” Butler-Freeport Trail “RESURFACING” Schedule (per Brad Jeannerat with JC Lee Construction 7/21/17 & John Haven, Chairman of the Buffalo Township Board of...
View ArticleTrail work date TBD
I wanted to give a heads up on another project on the trail. Late this week or next (will post when I have the exact date), Holbein, Inc will be paving the bridge approach to Fellowship Crossing...
View ArticleUpdate July 29th
(per Brad Jeannerat with JC Lee Construction/John Haven, Chairman of the Buffalo Township Board of Supervisors as of 7/28/17) TRAIL OPEN (EFFECTIVE JULY 28TH, 2017) LANEVILLE TO MONROE ROAD TRAIL...
View Article
More Pages to Explore .....